Vibration analysis
What it measuresVibration amplitude and spectrum
Typical failures detectedImbalance, misalignment, bearing and gear wear, looseness
Motors, pumps, fans, gearboxes, spindles
How it works, what data it needs, what it returns, and why it is within reach both for an SME with a few critical machines and for a group with hundreds of plants.
Figures from the illustrative example in the Return section: costs and times vary widely by sector and asset.
Predictive maintenance is a strategy that estimates the health and remaining life of a component from continuous or periodic measurements of how it runs, and schedules the job when degradation reaches a critical threshold, before the failure.
The European standard UNI EN 13306 on maintenance terminology describes it as condition-based maintenance carried out following a forecast derived from the analysis and evaluation of significant parameters of the item's degradation.
Why we talk about it. Nexus connects machines, sensors and company systems and turns operating data into information for the people who decide on maintenance jobs. Predictive maintenance is where data collection, software and maintenance organisation must work together.
Several approaches coexist in every plant, chosen asset by asset based on criticality and the cost of failure. Pick a strategy to see when it acts on the degradation curve.
When the model forecasts the failure within a useful horizon
Minimal unplanned stops, full use of component life, planned jobs
Requires sensors, historical data and analysis skills
Critical, costly assets with no redundancy
Health of a component over time
From emergency maintenance to maintenance planned on data.
Predictive maintenance works between the moment degradation becomes detectable and the functional failure: early enough to plan the job with the spare part ready, during a planned stop, late enough to use the component's life. Weeks or months usually pass between the two.
Legal obligations: predictive maintenance doesn't replace them. Some checks have intervals set by law (fire protection, periodic equipment inspections, earthing systems). Predictive maintenance adds to these checks, it doesn't remove them.
Every weak link reduces the value of the whole chain. Select a step to see what happens.
Dedicated sensors (vibration, temperature, current, pressure, ultrasound) or data already in the machine's PLC and CNC.
Every weak link reduces the value of the whole chain.
Sensors on motor, gearbox and pump, a gateway on the shop floor, a dashboard and a technician with the spare part ready.
Fast processing, works even without a network, reduces the data to transmit.
Long history, comparison across machines and plants, more complex models.
Many builders offer remote monitoring of their machines: useful, but the data must stay accessible to the company too.
An alarm when a parameter exceeds a limit, for example vibration beyond ISO 10816/20816 values.
A model learns normal behaviour and flags deviations, even with no failure history.
Statistical or machine-learning models estimate how long until the failure.
Choose the type of machine to see which techniques apply and which failures they help anticipate.
What it measuresVibration amplitude and spectrum
Typical failures detectedImbalance, misalignment, bearing and gear wear, looseness
Motors, pumps, fans, gearboxes, spindles
What it measuresTemperature distribution
Typical failures detectedOverheating, loose electrical connections, friction, degraded insulation
Electrical panels, motors, furnaces, bearings
What it measuresCurrent draw and waveform
Typical failures detectedRotor and stator faults, overloads, downstream mechanical problems
Electric motors, compressors, conveyors
What it measuresParticles, viscosity, water, contaminants
Typical failures detectedInternal wear, contamination, lubricant degradation
Gearboxes, hydraulic circuits, engines
What it measuresHigh-frequency acoustic emissions
Typical failures detectedAir and gas leaks, electrical discharges, poorly lubricated bearings
Compressed-air networks, valves, bearings
What it measuresPressure and flow trends
Typical failures detectedClogged filters, leaks, pump and valve wear
Hydraulic and pneumatic systems
What it measuresAxis loads, torques, cycles, alarms from the PLC or CNC
Typical failures detectedTool and guide wear, play, process drift
Machine tools, presses, robots
What it measuresDimensional measurements, scrap
Typical failures detectedProcess drift that anticipates a failure
Lines with in-line inspection
What it measuresConsumption per machine and per cycle
Typical failures detectedIncreasing friction, leaks, operation off the optimal point
Compressors, motors, furnaces, air conditioning
The failure becomes a planned job.
Components are replaced when needed, not on schedule.
Less safety stock, fewer urgent shipments.
A bearing replaced in time does not ruin the shaft or the gearbox.
Machine degradation often shows up first in scrap.
Fewer sudden breakdowns and fewer emergency jobs.
A degrading machine uses more energy.
What the expert technician knew «by ear» becomes a recorded measurement.
Same logic, different scale
In an SME one or two machines are often the bottleneck of the whole production, with no backup machine. A stop of a few days means missed deliveries.
Interface examples: one useful alarm is worth more than a thousand charts. Click the screenshot to view it full screen.
of jobs are planned: emergency work becomes the exception.
alarms confirmed in the quarter, with only one false alarm.
Press PR-02 goes to the top of the list, with the job already proposed for Saturday's planned stop.
Demo interfaces in Italian with sample data: plant, people and values are made up.
Return is calculated machine by machine: compare what an unplanned failure costs with what the same job costs when planned. The difference is the value of one avoided failure. The starting values are the guide's example: a critical machine running two shifts. Replace them with your own.
87,000 € unplanned failure − 18,000 € planned job
To compare with the cost of the system: sensors and installation, connectivity, platform or licences, integration with existing systems, people's time to analyse alarms, and training.
The assets where a stop weighs most, sector by sector.
Measure them before and after the pilot.
MES, maintenance software, spare-parts store, quality and the safety calendar: each one gives and receives something.
Spare parts ready, work orders in the CMMS and safety deadlines in the same flow.
Production context (order, item, speed, load), running hours, stops and causes, intervention windows.
Work orders created from alarms, job history that trains the models.
Spare-part availability and purchasing, job costs.
Scrap and process drift as early warning signals.
Mandatory maintenance, periodic inspections and check registers, which stay on schedule.
Abnormal consumption as a symptom of degradation.
Employers must keep equipment in suitable condition through adequate maintenance and subject it to the required checks and inspections. Predictive maintenance reduces sudden failures, which are also a risk for operators, but it doesn't replace mandatory periodic checks: it must be integrated with the calendar of legally required maintenance and inspections.
For investments from 1 January 2026 to 30 September 2028 the incentive in force in Italy is hyper-depreciation (Law 199/2025): an increase in the cost recognised for income-tax purposes of 180% up to €2.5 million, 100% up to €10 million and 50% up to €20 million. A predictive maintenance system can qualify in two ways:
A list of assets with, for each one, the impact of a stop on production, the cost of failures in recent years, redundancies and spare-part lead times. Choose the 3–10 assets where a failure costs most.
Where to startFor each chosen asset: how it usually fails, which signals anticipate the failure, which monitoring technique sees them.
What to look forWhat PLCs, CNCs and the MES expose; what is missing and needs sensors.
Before buyingSensor installation, a few weeks collecting normal behaviour, first thresholds and alarms.
A few weeksWho receives the alarm, how quickly they assess it, how it becomes a work order, how the outcome is recorded.
With maintenanceStops avoided, false alarms, costs compared with the starting point.
End of pilotTo other assets, other plants and more advanced models.
Step by stepTick the requirements the solution you are evaluating meets
Sensors suited to the environment (temperature, dust, humidity, ATEX zones) and easy to install
Reading data already in the machines, as well as new sensors
Clear alarms, with the likely cause and urgency
Integration with maintenance software and the MES
History kept for years and exportable in open formats; data owned by the company
Cybersecurity of sensors, gateways and platform
A proportionate cost model: per-asset subscription for an SME, a scalable platform for a group
Support from expert analysts in the first months, until the team is autonomous
Our goal is for every signal collected to reach the right person, with a clear indication, and become a planned job.
We start from the experience of maintenance technicians and shop-floor managers: they know how machines break. Together we define who receives the alarms and how to respond.
We collect data from sensors and machine controllers, link it to the production context in the MES and create work orders in the maintenance software.
We start with thresholds and anomalies on critical assets, measure stops avoided and false alarms, and introduce predictive models when the history allows it.
Between Modena, Reggio Emilia, Parma and Bologna there are districts building machines sold worldwide and companies using them every day. Predictive maintenance matters to both: builders can offer data-driven service, users can cut unplanned downtime.
Emilia-Romagna machinery and equipment exports in 2024, 26.8% of the regional total 1
2024 exports of the monitored Emilia-Romagna industrial districts 2
in Bologna, at the BI-REX competence centre: condition monitoring and machine diagnostics training 3
Where we work. We are based in Modena and work on site with companies in the provinces of Modena, Reggio Emilia, Parma and Bologna. We also work with companies in other provinces and regions, remotely or with agreed visits: write to us from anywhere in Italy.
14 questions
It is the strategy that uses data measured on machines and plants to predict when a component will fail and plan the job just before, avoiding both the failure and premature replacements.
Preventive maintenance acts at fixed intervals of time or hours, even if the component is still good. Predictive maintenance acts on the real condition and the degradation trend.
Yes. With a few wireless sensors on critical machines and a cloud platform, an SME can start at modest cost. Often a single avoided stop on the bottleneck machine pays for the system.
It lets you manage hundreds of assets by risk priority, compare similar plants across sites, integrate alarms, work orders and spare parts, and build reliable remaining-life models thanks to the volume of data.
No. You start with thresholds and anomaly detection, which need a few weeks or months of data. Remaining-life models come when the history of failures and jobs is sufficient.
It depends on the failures to prevent: accelerometers for vibration, temperature probes, current measurements, pressure sensors, ultrasound. Many useful signals are already available in modern machine controllers.
Yes. External sensors can be fitted to machines without advanced electronics; in fact, the oldest and most critical machines often benefit the most.
After installation it takes a few weeks to learn normal behaviour. The first useful anomalies can emerge within the first months.
No. Periodic inspections, fire-safety checks and maintenance required by law keep their deadlines. Predictive maintenance adds to them and reduces failures between one check and the next.
Yes, it can qualify for Italy's 2026–2028 hyper-depreciation (Law 199/2025), for investments from 1 January 2026 to 30 September 2028. Annex V on eligible software expressly lists predictive maintenance software, CMMS systems and monitoring of machine working conditions; Annex IV on tangible assets lists machine monitoring systems and devices for adding sensors, including on existing plants. Assets must be new and interconnected with the production management system, with a sworn technical appraisal and notifications to the GSE. How the software is acquired (ownership, licence or subscription) also matters: check case by case with your accountant and appraiser.
For each asset, compare the cost of an unplanned failure (downtime, emergency, collateral damage) with that of a planned job, multiply by the failures avoided in a year, and add the savings on spares and unnecessary maintenance.
A named owner: in SMEs the shop-floor manager or the technician, even external; in large companies the maintenance office or a monitoring centre. Without a response process, alarms lose their value.
Because it covers the whole chain: analysis of critical assets, data collection from machines and sensors, analysis software, integration with MES and maintenance, and defining the alarm response process. It starts small and grows on measured results.
In Bologna the BI-REX competence centre has a pilot line where it runs condition monitoring and diagnostics training, for example vibration analysis on bearings and gears. For a project in your company, start from one or two critical machines and the data that already exist.
Let's start there: we analyse how it fails, which data is already available and what is needed to get a warning before the next stop. We reply in person, usually within one working day.